On November 9th, 2019 at from 4pm-6pm, Salt Lake City staff will host a meet-up conversational Game Night Games. Please attend this special event and tell us about your ideas and priorities first hand. More information about the event is posted below. Survey will be available online November 9th, for those who can’t attend.
900 East is an important local corridor connecting numerous commercial nodes and residential neighborhoods in Salt Lake City. Additionally, 900 E provides important regional connectivity for motorists, transit users, bicyclists, and pedestrians to Millcreek, Murray, and points South.
In Fall 2019 and Winter 2020, Salt Lake City will be seeking community input for the rebuild of this street. Proposed changes are to be determined, and may include some changes to intersections, sidewalks, curbs, pedestrian crossings, bus stops, road striping, driveways ramps, and parking. Community input will be shared with the design team as we develop the draft concept in the next few months.
Fall 2019/Winter 2020 – Community outreach, input gathering, and draft conceptual design development
Winter/Spring 2020 – City design team develops engineering
drawings based on the conceptual design.
Summer/Fall 2020 – Final design. See what the street will look like.
Spring to Fall 2021 – Construction.
Further information on construction timeline and impacts will be available on this webpage as we get closer to construction.
The reconstruction of 900 East is one of the projects funded through a new Salt Lake City bond, which is part of the Funding Our Future initiative.